SPEN network capacity map
Generation headroom, fault levels and the connection queue for SP Energy Networks substations, taken from SPEN's open data and shown on one map with the other five GB distribution network operators. SPEN covers Central Scotland, South Scotland, Merseyside, Cheshire, North Wales.
What SPEN publishes
2,144
Busbars at Primary and above
48%
With generation headroom
49%
With demand headroom
72%
With a fault level
Share of busbars carrying each figure in the current build. Full method on the data coverage page.
SPEN sites with the most queued generation
| Site | Queued | Connected | Projects |
|---|---|---|---|
| Cockenzie | 1.8 GW | 0 MW | 9 |
| Pentir | 1.7 GW | 209 MW | 25 |
| Eccles | 1.1 GW | 58 MW | 10 |
| Carrington | 787 MW | 0 MW | 4 |
| East Kilbride | 606 MW | 122 MW | 14 |
| Chapelcross | 528 MW | 274 MW | 24 |
| Capenhurst | 528 MW | 501 MW | 32 |
| Kirkby | 458 MW | 130 MW | 24 |
| Coylton | 430 MW | 185 MW | 21 |
| Ince | 374 MW | 418 MW | 23 |
From the Embedded Capacity Register and the NESO TEC register. The full GB list is on the connection queue page.