NGED network capacity map
Generation headroom, fault levels and the connection queue for National Grid Electricity Distribution substations, taken from NGED's open data and shown on one map with the other five GB distribution network operators. NGED covers East Midlands, West Midlands, South Wales, South West.
What NGED publishes
11,950
Busbars at Primary and above
12%
With generation headroom
82%
With demand headroom
28%
With a fault level
Share of busbars carrying each figure in the current build. Full method on the data coverage page.
NGED sites with the most queued generation
| Site | Queued | Connected | Projects |
|---|---|---|---|
| East Claydon | 2.6 GW | 27 MW | 6 |
| Drakelow | 2.3 GW | 0 MW | 8 |
| Cellarhead | 1.3 GW | 20 MW | 9 |
| Enderby | 1.1 GW | 57 MW | 6 |
| Melksham | 1.0 GW | 2.1 MW | 4 |
| Bicker Fen | 1.0 GW | 62 MW | 10 |
| Willington | 775 MW | 14 MW | 6 |
| Ironbridge | 700 MW | 0 MW | 2 |
| Pembroke | 620 MW | 2.2 GW | 6 |
| Iron Acton | 613 MW | 0 MW | 16 |
From the Embedded Capacity Register and the NESO TEC register. The full GB list is on the connection queue page.