NGED network capacity map

Generation headroom, fault levels and the connection queue for National Grid Electricity Distribution substations, taken from NGED's open data and shown on one map with the other five GB distribution network operators. NGED covers East Midlands, West Midlands, South Wales, South West.

What NGED publishes

11,950
Busbars at Primary and above
12%
With generation headroom
82%
With demand headroom
28%
With a fault level

Share of busbars carrying each figure in the current build. Full method on the data coverage page.

NGED sites with the most queued generation

SiteQueuedConnectedProjects
East Claydon2.6 GW27 MW6
Drakelow2.3 GW0 MW8
Cellarhead1.3 GW20 MW9
Enderby1.1 GW57 MW6
Melksham1.0 GW2.1 MW4
Bicker Fen1.0 GW62 MW10
Willington775 MW14 MW6
Ironbridge700 MW0 MW2
Pembroke620 MW2.2 GW6
Iron Acton613 MW0 MW16

From the Embedded Capacity Register and the NESO TEC register. The full GB list is on the connection queue page.