Ince

BSPSPEN132 kV33 kV

At a glance

Sources retrieved 27 Sep 2026
Generation headroom
Not published
Demand headroom
Not published
Fault level
██.█kA
Ince 132kV. SPM LTDS Appendix 4 Fault Levels (Table 4) 132kV 3ph
Firm capacity
Not published

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

No published position for this site

Connection queue

SPEN Embedded Capacity Register (>1 MW), retrieved 27 Sep 2026

Queued
██.█MW
Connected
██.█MW
Projects
23
Unlock the full 23-project queue with a premium subscription

132 kV

1 busbar

Ince 132kV

SPENdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
SPM LTDS Appendix 4 Fault Levels (Table 4) 132kV 3ph

Not published for this busbar: generation headroom, demand headroom, firm capacity.

GSP export limitGSP group
██.█MW
at all times. SPM GSP Technical Limits, retrieved 27 Sep 2026
GSP import limitGSP group
██.█MW
access period (Mar-May, Sep-Nov). SPM GSP Technical Limits, retrieved 27 Sep 2026
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

33 kV

1 busbar

Ince 33kV

SPENdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
SPM LTDS Appendix 4 Fault Levels (Table 4) 33kV 3ph

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Planned reinforcement

1 scheme, first in service 2029DNO Network Development Reports
SchemeDriverUpliftIn service
Refurbishment of 33kV CBsWirral2029

Data source

Network operator: SP Energy Networks. Licence: CC BY 4.0

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences