Sowerby Bridge

BSPNPG132 kV33 kV11 kV

Upstream:GSPElland· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Over 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
SOWERBY BRIDGE 21 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
SOWERBY BRIDGE 21 33 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
SOWERBY BRIDGE 21 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.70887, -1.92444

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026

Queued
0.3 MW
Connected
2.7 MW
Projects
20
See the 20 projects behind this queue with Pro

33 kV

1 busbar

SOWERBY BRIDGE 21 33 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

Sowerby Bridge 33/11kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 132 kVSOWERBY BRIDGE 21 132 kV NPGNo capacity or fault data published for this busbar

Planned reinforcement

3 schemes, first in service 2033DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of 1.2km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 10km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 6.4km of 33kV overhead lineCondition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences