Elland
GSPNPGNGET275 kV 132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
17
Projects
Planned Reinforcement
DNO Network Development Reports+64 MVA
Total uplift
2026
First completion
1
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of the Elland to Sowerby Bridge 1 and 2 132kV circuit | Asset replacement due to deteriorating condition | +63.5 MVA | 2026 |
Capacity Forecast
Premium Unlock multi-year capacity forecasts with premium
Voltage Levels (4)
275kV
1 busbar132kV
1 busbarVoltage unspecified
2 busbarsData Source
Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.