Pallion Trading
Upstream:BSPSunderlandGSPOfferton· headroom can be limited upstream
At a glance
Generation headroom, free
Red
Network operator's rating, limited by fault level, not headroom
5 to 20MW
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro
Pro shows the exact figure, plus 36 nearby sites with more than 5 MW headroom. See Pro
Other figures
Sources retrieved 14 Nov 2026Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW), retrieved 14 Nov 2026
- Queued
- 0.0 MW
- Connected
- 2.1 MW
- Projects
- 1
11 kV
1 busbarVoltage not stated
1 busbarPALLION TRADING 60
NPGdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, fault level.
Other voltage levels
- 33 kVPallion Trading 33 kV NPGNo capacity or fault data published for this busbar
Planned reinforcement
2 schemes, first in service 2033DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 11kV switchgear | Condition | +0.0 MVA | 2033 |
| Replacement of 33kV Transformer T1 | Condition | +0.0 MVA | 2033 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences