Offerton

GSPNPGNGET275 kV33 kV11 kV

At a glance

Generation headroom, free

Red

Network operator's rating, limited by fault level, not headroom

Over 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 14 Nov 2026
Demand headroom
██.█MW
Offerton 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
Offerton 33 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
Offerton 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

54.88069, -1.45638

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 14 Nov 2026

Queued
68 MW
Connected
2.9 MW
Projects
6
See the 6 projects behind this queue with Pro

33 kV

1 busbar

Offerton 33 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

Offerton 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 275 kVOfferton 275 kV NGETNot openly published by NESO
  • Voltage not statedOfferton NGETNot openly published by NESO

Planned reinforcement

1 scheme, first in service 2030DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of 33kV switchboardConnections2030

Data source

Distribution operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence

Supported by Northern Powergrid Open Data Supported by National Energy SO Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences