Generation headroom, free
Red
Network operator's rating, limited by fault level, not headroom
Over 20MW
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 14 Nov 2026Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 14 Nov 2026
- Queued
- 68 MW
- Connected
- 2.9 MW
- Projects
- 6
33 kV
1 busbar11 kV
1 busbarOfferton 11 kV
NPG Generation LockeddistributionOther voltage levels
- 275 kVOfferton 275 kV NGETNot openly published by NESO
- Voltage not statedOfferton NGETNot openly published by NESO
Planned reinforcement
1 scheme, first in service 2030DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 33kV switchboard | Connections | 2030 |
Data source
Distribution operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence