Hayton

PrimaryNPG66 kV11 kV6 kV

Upstream:GSPCreyke Beck· headroom can be limited upstream

At a glance

Generation headroom, free

Red

No headroom

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
HAYTON 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
HAYTON 11 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
HAYTON 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.90828, -0.76443

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026

Queued
1.0 MW
Connected
4.8 MW
Projects
29
See the 29 projects behind this queue with Pro

11 kV

1 busbar

HAYTON 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 66 kVHAYTON 66 kV NPGNo capacity or fault data published for this busbar
  • 6 kVHAYTON 6 kV NPGNo capacity or fault data published for this busbar
  • Voltage not statedHayton NPGNo capacity or fault data published for this busbar

Planned reinforcement

1 scheme, +15 MVA, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of Transformers T1 & T2Load+14.7 MVA2026

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences