Creyke Beck

BSPNPGNGET132 kV

Location

Loading map...
Coordinates

53.800973, -0.414491

From DNO data
Get Directions

Site Summary

Voltage Levels

2

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NGET, NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
35
Projects
Unlock the full 35-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2025
First completion
4
Schemes
SchemeDriverUpliftIn service
Fault level reinforcement investment to replace the 66kV switchgear at Driffield 132/66kVFault level reinforcement investment2025
Replacement of 66kV Circuit BreakersAsset replacement due to deteriorating condition and performance2026
Replacement of one transformer at Beverley 132/33kVAsset replacement due to deteriorating condition and performance2027
Replacement of 8.9km of 132kV underground cablesConnections+0.0 MVA2028

Voltage Levels (2)

132kV

2 busbars
Creyke BeckNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 32.7 kA

Firm Capacity

N/A

CREYKE BECK GSP 132 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg

Demand Headroom

██.█MW

native:cim-npg

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Data Source

Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.