Creyke Beck
BSPNPGNGET132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
35
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2025
First completion
4
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Fault level reinforcement investment to replace the 66kV switchgear at Driffield 132/66kV | Fault level reinforcement investment | — | 2025 |
| Replacement of 66kV Circuit Breakers | Asset replacement due to deteriorating condition and performance | — | 2026 |
| Replacement of one transformer at Beverley 132/33kV | Asset replacement due to deteriorating condition and performance | — | 2027 |
| Replacement of 8.9km of 132kV underground cables | Connections | +0.0 MVA | 2028 |
Voltage Levels (2)
Data Source
Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.