Elgar Road

PrimaryNPG33 kV 11 kV 6.6 kV

Location

Loading map...
Coordinates

53.739091, -0.434818

Matched from heatmap
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
1
Projects
Unlock the full 1-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2026
First completion
3
Schemes
SchemeDriverUpliftIn service
Replacement of 33kV and 11kV switchgearCondition+0.0 MVA2026
Replace the 33kV and 11kV switchgearAsset replacement due to deteriorating condition and performance2026
Replacement of 33kV Transformer T2Condition+0.0 MVA2033

Capacity Forecast

Premium
Unlock multi-year capacity forecasts with premium

Voltage Levels (3)

33kV

1 busbar
ELGAR ROAD 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

11kV

1 busbar
ELGAR ROAD 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

6.6kV

1 busbar
ELGAR ROAD 6 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.