Bolton Road

PrimaryNPG33 kV11 kV

Upstream:BSPBradfordGSPBradford West· headroom can be limited upstream

At a glance

Generation headroom, free

Red

5 to 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
BOLTON ROAD 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
BOLTON ROAD 11 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
BOLTON ROAD 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.91669, -1.93378

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026

Queued
0.0 MW
Connected
0.3 MW
Projects
5
See the 5 projects behind this queue with Pro

11 kV

1 busbar

BOLTON ROAD 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Voltage not stated

2 busbars

BOLTON ROAD LOCAL 179

NPGdistribution Source (opens the operator's dataset in a new tab)
Demand headroom
██.█MW
NPG Site Utilisation (npg-site-utilisation), carried from v1, retrieved 10 Jun 2026
Firm capacity
██.█MVA
NPG Site Utilisation (npg-site-utilisation), carried from v1, retrieved 10 Jun 2026

Not published for this busbar: generation headroom, fault level.

Other voltage levels

  • 33 kVBOLTON ROAD 33 kV NPGNo capacity or fault data published for this busbar

Planned reinforcement

1 scheme, +15 MVA, first in service 2027DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of transformer T1 and T2Condition+14.7 MVA2027

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences