Bradford West
BSPNPGNGET132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
37
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2026
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 3 x 132kV transformers, 3 x 132kV circuit breakers and 17 x 33kV circuit breakers at Silsden 132/33kV substation | Asset replacement due to deteriorating condition and performance and fault level reinforcement investment | — | 2026 |
| Replacement of 132kV switchgear | Connections | — | 2031 |
Voltage Levels (2)
Data Source
Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)