Urlay Nook

PrimaryNPG33 kV11 kV

Upstream:GSPNorton· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Network operator's rating, limited by fault level, not headroom

No headroom

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Pro shows the exact figure, plus 3 nearby sites with more than 5 MW headroom. See Pro

Other figures

Sources retrieved 14 Nov 2026
Demand headroom
██.█MW
Urlay Nook 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
Urlay Nook 11 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
Urlay Nook 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

54.52420, -1.37844

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2; NPG Embedded Capacity Register (>=1 MW), retrieved 14 Nov 2026

Queued
1.0 MW
Connected
4.3 MW
Projects
6
See the 6 projects behind this queue with Pro

11 kV

1 busbar

Urlay Nook 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 33 kVUrlay Nook 33 kV NPGNo capacity or fault data published for this busbar
  • Voltage not statedURLAY NOOK FIREARMS NPGNo capacity or fault data published for this busbar
  • Voltage not statedUrlay Nook NPGNo capacity or fault data published for this busbar

Planned reinforcement

4 schemes, +23 MVA, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of 6.2km of 33kV underground cablesCondition+0.0 MVA2026
Replacement of 11kV switchgear in new switchboard room with an Automated Power Restoration System (APRS) in placeLoad+22.8 MVA2033
Replacement of 3.1km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 3km of 33kV overhead lineCondition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences