Saint Andrews Road

BSPNPG132 kV 33 kV 11 kV +1 more
Grid capacity by postcode district: HD1HD2HD5

Location

Loading map...
Coordinates

53.650735, -1.773151

From DNO data
Get Directions

Site Summary

Voltage Levels

7

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Network Hierarchy

CurrentSaint Andrews Road

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
3
Projects
Unlock the full 3-project queue with a premium subscription

Voltage Levels (7)

132kV

1 busbar
ST ANDREWS ROAD GSP 23 132 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

33kV

3 busbars
Saint Andrews Road 132/33kVNPGunknown
distribution
Gen Headroom

██.█MW

NPG Heatmap Data

Demand Headroom

██.█MW

NPG Heatmap Data

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

ST ANDREWS ROAD GSP 23 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

ST ANDREWS ROAD 23 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

11kV

2 busbars
Saint Andrews Road 33/11kVNPGunknown
distribution
Gen Headroom

██.█MW

NPG Heatmap Data

Demand Headroom

██.█MW

NPG Heatmap Data

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

ST ANDREWS ROAD 23 11 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

6.6kV

1 busbar
ST ANDREWS ROAD 23 6 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

Data Source

Primary DNO:Northern Powergrid

Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.