Rawson Spring Road

PrimaryNPG33 kV 11 kV 6.6 kV

Location

Loading map...
Coordinates

53.413341, -1.485194

Matched from heatmap
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
1
Projects
Unlock the full 1-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2028
First completion
2
Schemes
SchemeDriverUpliftIn service
Replacement of 33kV CableCondition+0.0 MVA2028
Installation of a new 33kV circuit and removal of 33kV switchgearFault level+0.0 MVA2033

Capacity Forecast

Premium
Unlock multi-year capacity forecasts with premium

Voltage Levels (3)

33kV

1 busbar
RAWSON SPRING ROAD 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

11kV

1 busbar
RAWSON SPRING ROAD 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:npg-site-utilisation

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

6.6kV

1 busbar
RAWSON SPRING ROAD 6 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.