Neepsend
GSPNPGNGET275 kV 33 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
1
Projects
Planned Reinforcement
DNO Network Development Reports+6 MVA
Total uplift
2026
First completion
4
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 6.3km of 33kV underground cables | Condition | +0.0 MVA | 2026 |
| Replacement of the Neepsend – Clay Wheels Lane 1 33kV circuit | Asset replacement due to deteriorating condition | — | 2026 |
| Replacement of the Neepsend – Rawson Road T1 33kV circuit | Asset replacement due to deteriorating condition | +6.0 MVA | 2028 |
| Replacement of 33kV Switchgear | Connections | — | 2030 |
Voltage Levels (3)
275kV
1 busbar33kV
1 busbarData Source
Distribution Operator:Northern Powergrid
Transmission Owner:National Grid Electricity Transmission
Licence:NESO Open Data Licence