Northallerton

PrimaryNPG33 kV 11 kV
Grid capacity by postcode district: DL10DL6DL7TS7YO7

Location

Loading map...
Coordinates

54.346974, -1.479436

From DNO data
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Network Hierarchy

CurrentNorthallerton

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
12
Projects
Unlock the full 12-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2033
First completion
1
Schemes
SchemeDriverUpliftIn service
Replacement of 33kV Transformer T1Condition+0.0 MVA2033

Voltage Levels (3)

33kV

1 busbar
Northallerton 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

11kV

1 busbar
Northallerton 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

Voltage unspecified

1 busbar
NorthallertonNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid

Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.