MENSTON 132 kV
NPGdistributionNot published for this busbar: generation headroom, demand headroom, firm capacity.
Upstream:GSPBradford West· headroom can be limited upstream
Generation headroom, free
Amber
Over 20MW
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 15 Oct 2026Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
NPG Embedded Capacity Register (>=1 MW), retrieved 15 Oct 2026
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 2.5km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences