Kirkstall C Ring Road Horsforth
Upstream:BSPLeedsGSPKirkstall B· headroom can be limited upstream
At a glance
Generation headroom, free
Green
Over 20MW
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Band free, exact MW with Pro
Other figures
Sources retrieved 15 Oct 2026Fault level near your switchgear rating? Star Delta Power does the study.
Location
Connection queue
NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026
- Queued
- 0.2 MW
- Connected
- 0.1 MW
- Projects
- 2
33 kV
1 busbarData source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences