Generation Locked Sources retrieved 27 Sep 2026- Generation headroom
- ██.█MW
- HULL EAST 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 27 Sep 2026
- Projects
- 5
33 kV
1 busbar11 kV
1 busbarHULL EAST 11 kV
NPG Generation LockeddistributionOther voltage levels
- 132 kVHULL EAST 132 kV NPGNo capacity or fault data published for this busbar
- 6 kVHULL EAST 6 kV NPGNo capacity or fault data published for this busbar
Planned reinforcement
2 schemes, first in service 2027DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 11kV switchgear in a new switchroom. | Condition | +0.0 MVA | 2027 |
| Replacement of 132kV Grid Transformers | Condition | +0.0 MVA | 2027 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0