Hawthorn Pit
GSPNPGNGET275 kV 66 kV 20 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
23
Projects
Planned Reinforcement
DNO Network Development Reports+1 MVA
Total uplift
2026
First completion
4
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 20kV switchgear | Condition | +0.7 MVA | 2026 |
| Replacement of 66kV circuit breakers | Condition | — | 2026 |
| Replace the 66kV circuit breakers | Asset replacement due to deteriorating condition and performance | — | 2026 |
| Replace the 20kV switchgear | Asset replacement due to deteriorating condition and performance | — | 2027 |
Voltage Levels (5)
275kV
2 busbars66kV
1 busbar20kV
1 busbarData Source
Distribution Operator:Northern Powergrid
Transmission Owner:National Grid Electricity Transmission
Licence:NESO Open Data Licence