Driffield

BSPNPG132 kV 66 kV 11 kV +1 more
Grid capacity by postcode district: HD8YO25

Location

Loading map...
Coordinates

53.999276, -0.417219

From DNO data
Get Directions

Site Summary

Voltage Levels

7

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Network Hierarchy

CurrentDriffield

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
41
Projects
Unlock the full 41-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2033
First completion
4
Schemes
SchemeDriverUpliftIn service
Replacement of 16.7km of 66kV overhead lineCondition+0.0 MVA2033
Replacement of 11.1km of 66kV overhead lineCondition+0.0 MVA2033
Replacement of 15.2km of 66kV overhead lineCondition+0.0 MVA2033
Replacement of 66kV SwitchgearFault level+0.0 MVA2033

Voltage Levels (7)

132kV

1 busbar
DRIFFIELD 132 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

66kV

2 busbars
Driffield/Beverley GroupNPGunknown
distribution
Gen Headroom

██.█MW

Demand Headroom

██.█MW

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

DRIFFIELD 66 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

11kV

1 busbar
DRIFFIELD 11 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

6.6kV

1 busbar
DRIFFIELD 6 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Voltage unspecified

2 busbars
Driffield/Beverley GroupNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

DriffieldNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid

Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.