Compton Martin 33/11Kv S/S
NGED Generation Lockeddistribution- Generation headroom
- ██.█MW
- NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026
Not published for this busbar: firm capacity.
Upstream:GSPSandford Sgp· headroom can be limited upstream
Generation headroom, free
Amber
Under 5MW
Source NGED Network Opportunity Map headroom (file, 121,078 rows), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 27 Sep 2026Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
Not published for this busbar: firm capacity.
Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence
Supported by NGED Open Data
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences