Sandford Sgp

GSPNGED132 kV

At a glance

Generation headroom, free

Not published

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
Not published
Fault level
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
Not published

Fault level near your switchgear rating? Star Delta Power does the study.

Location

No published position for this site

Connection queue

NGED connection queue, 45 per-GSP CSVs, one row per machine, retrieved 27 Sep 2026

Queued
223 MW
Connected
0.0 MW
Projects
6
See the 6 projects behind this queue with Pro

132 kV

1 busbar

Sandford SGP 132 kV

NGEDdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Data source

Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Supported by NGED Open Data

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences