Churchill

BSPNGED132 kV33 kV

Upstream:GSPSandford Sgp· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Over 20MW

Source NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
██.█MW
Churchill BSP 33 kV. NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Fault level
██.█kA
Churchill BSP 132 kV. NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
██.█MVA
Churchill BSP 33 kV. NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

51.35825, -2.78812

From DNO data
Directions (Google Maps, new tab)

Connection queue

NGED connection queue, 45 per-GSP CSVs, one row per machine, retrieved 27 Sep 2026

Queued
125 MW
Connected
0.0 MW
Projects
4
See the 4 projects behind this queue with Pro

132 kV

1 busbar

Churchill BSP 132 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

33 kV

1 busbar

Churchill BSP 33 kV

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Data source

Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Supported by NGED Open Data

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences