Beverley

BSPNPG132 kV66 kV33 kV

Upstream:GSPCreyke Beck· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Over 20MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
BEVERLEY 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
BEVERLEY 66 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
BEVERLEY 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.82101, -0.41565

Matched from heatmap
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register (>=1 MW), retrieved 15 Oct 2026

Queued
120 MW
Connected
0.0 MW
Projects
3
See the 3 projects behind this queue with Pro

66 kV

1 busbar

BEVERLEY 66 kV

NPGdistribution
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

33 kV

1 busbar

BEVERLEY 33 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 132 kVBEVERLEY 132 kV NPGNo capacity or fault data published for this busbar

Planned reinforcement

8 schemes, first in service 2028DNO Network Development Reports
SchemeDriverUpliftIn service
These works will impact upon the available capacity at this supply point.Asset replacement due to deteriorating condition and performance2028
Replacement of Transformer GT1 & GT2Condition+0.0 MVA2028
Replacement of 33kV switchboardConnections+0.0 MVA2028
Replacement of 1.7km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 2.4km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 1.3km of 33kV underground cableCondition+0.0 MVA2033
Replacement of 1.6km of 33kV overhead lineCondition+0.0 MVA2033
Replacement of 10.7km of 33kV overhead lineCondition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences