BEVERLEY 66 kV
NPGdistributionNot published for this busbar: generation headroom, demand headroom, firm capacity.
Upstream:GSPCreyke Beck· headroom can be limited upstream
Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
NPG Embedded Capacity Register (>=1 MW), retrieved 27 Sep 2026
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| These works will impact upon the available capacity at this supply point. | Asset replacement due to deteriorating condition and performance | 2028 | |
| Replacement of Transformer GT1 & GT2 | Condition | +0.0 MVA | 2028 |
| Replacement of 33kV switchboard | Connections | +0.0 MVA | 2028 |
| Replacement of 1.7km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
| Replacement of 2.4km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
| Replacement of 1.3km of 33kV underground cable | Condition | +0.0 MVA | 2033 |
| Replacement of 1.6km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
| Replacement of 10.7km of 33kV overhead line | Condition | +0.0 MVA | 2033 |
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences