Grid capacity in South Eastern Power Networks (SPN)
Grid capacity overview for South Eastern Power Networks (SPN): 294 substations, 7.01 GW of generation in the connection queue, operated primarily by UKPN.
294
Sites
568
Busbars
7.01 GW
Queued
3.68 GW
Connected
34%
% Connected
Top sites by queued generation
| # | Site | DNO | Queued | Connected | Projects |
|---|---|---|---|---|---|
| 1 | Kingsnorth132 kV | UKPN | 1.95 GW | 879 MW | 17 |
| 2 | Ninfield132 kV | UKPN | 1.11 GW | 185 MW | 13 |
| 3 | Bolney132 kV | UKPN | 916 MW | 973 MW | 16 |
| 4 | Richborough132 kV | UKPN | 718 MW | 146 MW | 19 |
| 5 | Laleham132 kV | UKPN | 452 MW | 5.3 MW | 6 |
| 6 | Northfleet East132 kV | UKPN | 324 MW | 41 MW | 11 |
| 7 | Sellindge132 kV | UKPN | 274 MW | 20 MW | 8 |
| 8 | Kemsley132 kV | UKPN | 167 MW | 242 MW | 9 |
| 9 | Canterbury North132 kV | UKPN | 130 MW | — | 3 |
| 10 | Chessington132 kV | UKPN | 128 MW | — | 2 |
About South Eastern Power Networks (SPN)
South Eastern Power Networks (SPN) is served primarily by UKPN. We track 294 grid substations and 568 individual busbars in this area, with 7.01 GW of generation currently in the connection queue and 3.68 GW already connected. Data is sourced from each DNO's published Embedded Capacity Register and the NESO Transmission Entry Capacity register, refreshed on each DNO publication.