Kingsnorth

BSPUKPNNGET132 kV11 kV

At a glance

Sources retrieved 7 Oct 2026
Generation headroom
██.█MW
KINGSNORTH GRID 11KV. UKPN DFES Network Headroom Report (three category rows per site), retrieved 27 Sep 2026
Demand headroom
██.█MW
KINGSNORTH GRID 11KV. UKPN LTDS Table 3b Load Data (true, coincident), retrieved 27 Sep 2026
Fault level
██.█kA
KINGSNORTH 132KV. UKPN LTDS Table 4a Fault level data - 3 phase
Firm capacity
██.█MVA
KINGSNORTH GRID 11KV. UKPN LTDS Table 3b Load Data (true, coincident), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

51.41803, 0.60007

From DNO data
Directions (Google Maps, new tab)

Connection queue

UKPN Embedded Capacity Register 2 (>=1 MW); UKPN Embedded Capacity Register 1 (<1 MW) and 1 more, retrieved 7 Oct 2026

Queued
██.█MW
Connected
██.█MW
Projects
17
Unlock the full 17-project queue with a premium subscription

132 kV

1 busbar

KINGSNORTH 132KV

UKPNdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
UKPN LTDS Table 4a Fault level data - 3 phase

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

KINGSNORTH GRID 11KV

UKPNdistribution Source (opens the operator's dataset in a new tab)
Generation headroom
██.█MW
UKPN DFES Network Headroom Report (three category rows per site), retrieved 27 Sep 2026
Demand headroom
██.█MW
UKPN LTDS Table 3b Load Data (true, coincident), retrieved 27 Sep 2026
Firm capacity
██.█MVA
UKPN LTDS Table 3b Load Data (true, coincident), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
UKPN LTDS Table 4a Fault level data - 3 phase
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • Voltage not statedKingsnorth NGETNot openly published by NESO

Data source

Distribution operator: UK Power Networks. Licence: CC BY 4.0

Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence

Supported by National Energy SO Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences