Iver 132kV GSP
GSPSSEN132 kV
Network Hierarchy
No upstream hierarchy information available
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Generation Headroom
Not in DNO data
Demand Headroom
Not in DNO data
Network Constraints
Constraint Details
- Gen: Substation Fault Level
- Demand: Substation Thermal Capacity
- Replace 132kV switchgear to achieve a rating of 40kA make / 100kA break (Jun-28) Establish a new Denham B BSP including 2 x 90MVA transformers, transferring Denham Avenue Primary and Gerrards Cross Primary to the new BSP
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
BSP (6)
| Name | Voltage | Status |
|---|---|---|
| CHALVEY 33 kV | 33 kV | - |
| CIPPENHAM 33 kV | 33 kV | - |
| LONGFORD 33 kV | 33 kV | - |
| SLOUGH 33 kV | 33 kV | - |
| DENHAM 22 kV | 22 kV | - |
| UPTON 22 kV | 22 kV | - |
Primary (2)
| Name | Voltage | Status |
|---|---|---|
| Beaconsfield (End Busbars) Primary | 6.6 kV | - |
| Beaconsfield (Middle Busbars) Primary | 6.6 kV | - |
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.