Bramley (Basi) GSP
GSPSSEN132 kV
Network Hierarchy
No upstream hierarchy information available
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Generation Headroom
Not in DNO data
Demand Headroom
Not in DNO data
Network Constraints
Constraint Details
- Gen: Substation Thermal Capacity
- Establish a new 132kV switchboard at Bramley, split the existing Bramley-Fleet 132kV network with the new Bramley 132kV board serving Basingstoke, Burghfield and Reading BSP's
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
BSP (3)
| Name | Voltage | Status |
|---|---|---|
| Basingstoke (T1B & T2B) BSP | 33 kV | - |
| Basingstoke (T3 & T4) BSP | 33 kV | - |
| Basingstoke (T1A & T2A) BSP | 32 kV | - |
Primary (1)
| Name | Voltage | Status |
|---|---|---|
| Oarkridge Primary | 11 kV | - |
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.