Basingstoke (T1A & T2A) BSP
BSPSSEN32 kV
Network Hierarchy
CurrentBasingstoke (T1A & T2A) BSP
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Gen: Upstream Thermal Capacity & Substation Fault Level
- Replace the 60MVA transformer with a 90MVA unit (Mar-26) Replace the 33kV board with 31.5kA break / 78.8kA make switchgear
- Upstream queue: 537.0MW
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.