BEACONSFIELD (MIDDLE B/B)
PrimarySSEN6.6 kV
Network Hierarchy
CurrentBEACONSFIELD (MIDDLE B/B)
BSPDENHAM
GSPIVER 132KV
Headroom may be constrained by upstream infrastructure (BSP/GSP)
Network Constraints
Constraint Details
- Upstream constrained
- Upgrade of 3 275/132kV SGTs required as per current Modification Application. Modification Application in progress to assess capacity at Iver 132kV Establish a new 132kV busbar and 132kV rated Denham BSP including 2 x 90MVA BSP transformers fed from Iver 132, this will shift the existing Denham Avenue and Gerrards Cross Primaries away from Denham 22kV (Jan 2029) Install 2 new 33kV circuits from Loudwater GSP feeding a new 2 x 40MVA 33/11/6.6kV substation rationalising the existing Beaconsfield End / Beaconsfield Middle substation layout (March 2029)
Upstream TX Queue N/A
contracted generationat upstream GSP
High queue indicates significant generation already contracted at this connection point.
Nearby Substations
Data Source
Data sourced from publicly available DNO datasets. This data is indicative and should be verified directly with the DNO before making connection decisions.