Wormald Green

BSPNPG132 kV 33 kV 11 kV
Grid capacity by postcode district: HG1HG3HG4HG5YO51

Location

Loading map...
Coordinates

54.074923, -1.522594

From DNO data
Get Directions

Site Summary

Voltage Levels

4

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Network Hierarchy

CurrentWormald Green

Headroom may be constrained by upstream infrastructure (BSP/GSP)

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
11
Projects
Unlock the full 11-project queue with a premium subscription

Voltage Levels (4)

132kV

1 busbar
WORMALD GREEN 132 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Fault Level (1ph)

██.█kA

Make Rating

██.█kA

Break Rating

██.█kA

33kV

1 busbar
WORMALD GREEN 33 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

11kV

2 busbars
Wormald Green 132/11kV DirectNPGunknown
distribution
Gen Headroom

██.█MW

Demand Headroom

██.█MW

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

WORMALD GREEN 11 kVNPG
distribution
Gen Headroom

██.█MW

NPG NDP forecast snapshot (2026 HT)

Demand Headroom

██.█MW

NPG NDP forecast snapshot (2026 HT)

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Make Rating

██.█kA

Break Rating

██.█kA

Data Source

Primary DNO:Northern Powergrid

Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.