Strathleven 33kV
SPENdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, demand headroom, firm capacity.
Generation headroom, free
Red
No headroom
Source SPD Network Scenario Headroom Report, retrieved 27 Sep 2026Highest of 5 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 14 Oct 2026Highest figure across the site's 5 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
SPEN Embedded Capacity Register (>1 MW); SSEN ECR Part 1, 1 MW and 50 kW registers (files), retrieved 14 Oct 2026
Not published for this busbar: generation headroom, demand headroom, firm capacity.
Not published for this busbar: generation headroom, demand headroom, firm capacity.
Not published for this busbar: generation headroom, demand headroom, firm capacity.
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 33kV CBs | Glasgow | 2026 |
Distribution operator: SP Energy Networks. Licence: CC BY 4.0
Transmission owner: Scottish Power Transmission. Licence: CC BY 4.0
Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences