Stow
Upstream:GSPKeadby· headroom can be limited upstream
At a glance
Generation headroom, free
Red
Network operator's rating, limited by fault level, not headroom
No headroom
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 14 Nov 2026Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 14 Nov 2026
- Queued
- 0.8 MW
- Connected
- 16 MW
- Projects
- 8
11 kV
1 busbarOther voltage levels
- 33 kVSTOW 41 33 kV NPGNo capacity or fault data published for this busbar
- Voltage not statedStow NPGNo capacity or fault data published for this busbar
- Voltage not statedSTOW STANDBY AUX TRANS 21643 NPGNo capacity or fault data published for this busbar
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences