Stella North
BSPNPGNGET132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
4
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2027
First completion
1
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replace 20kV switchgear in a new switchroom | Asset replacement due to deteriorating condition and performance | — | 2027 |
Voltage Levels (5)
132kV
4 busbarsStella NorthNGET
transmissionStella NorthNPGunknown
distributionStella North Reserve 132kVNPG
distributionData Source
Distribution Operator:Northern Powergrid
Transmission Owner:National Grid Electricity Transmission
Licence:NESO Open Data Licence
Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.