Stainforth

PrimaryNPG66 kV11 kV

Upstream:GSPWest Melton / Thorpe Marsh· headroom can be limited upstream

At a glance

Generation headroom, free

Red

Network operator's rating, limited by fault level, not headroom

No headroom

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 3 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 14 Nov 2026
Demand headroom
██.█MW
STAINFORTH 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
STAINFORTH 11 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
STAINFORTH 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

53.59457, -1.01963

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 14 Nov 2026

Queued
0.9 MW
Connected
2.8 MW
Projects
7
See the 7 projects behind this queue with Pro

11 kV

1 busbar

STAINFORTH 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 66 kVSTAINFORTH 66 kV NPGNo capacity or fault data published for this busbar
  • Voltage not statedStainforth NPGNo capacity or fault data published for this busbar

Planned reinforcement

2 schemes, +1 MVA, first in service 2027DNO Network Development Reports
SchemeDriverUpliftIn service
Relocate the substation to a new suitable site and install new plant.Condition+1.0 MVA2027
These works will impact upon the available capacity at this primary substation.Asset replacement due to deteriorating condition and performance2027

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences