South Kirkby

PrimaryNPG66 kV11 kV6 kV

Upstream:GSPFerrybridge A· headroom can be limited upstream

At a glance

Generation headroom, free

Green

Under 5MW

Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 4 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 15 Oct 2026
Demand headroom
██.█MW
SOUTH KIRKBY 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level
██.█kA
SOUTH KIRKBY 11 kV. NPG LTDS Appendix 6 Fault Level Data
Firm capacity
██.█MVA
SOUTH KIRKBY 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026

Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.60101, -1.33294

From DNO data
Directions (Google Maps, new tab)

Connection queue

NPG Embedded Capacity Register Part 2; NPG Embedded Capacity Register (>=1 MW), retrieved 15 Oct 2026

Queued
1.0 MW
Connected
2.4 MW
Projects
3
See the 3 projects behind this queue with Pro

11 kV

1 busbar

SOUTH KIRKBY 11 kV

NPG Generation Lockeddistribution
Generation headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Demand headroom
██.█MW
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NPG LTDS Appendix 6 Fault Level Data
Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

Other voltage levels

  • 66 kVSOUTH KIRKBY 66 kV NPGNo capacity or fault data published for this busbar
  • 6 kVSOUTH KIRKBY 6 kV NPGNo capacity or fault data published for this busbar
  • Voltage not statedSouth Kirkby NPGNo capacity or fault data published for this busbar

Planned reinforcement

1 scheme, first in service 2033DNO Network Development Reports
SchemeDriverUpliftIn service
Replacement of 66kV Transformer T1&T2Condition+0.0 MVA2033

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences