Skelton Grange
BSPNPGNGET132 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
24
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2025
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 11kV switchgear | Asset replacement due to deteriorating condition and performance | — | 2025 |
| Replacement of 11kV circuit breakers | Asset replacement due to deteriorating condition and performance | — | 2027 |
Voltage Levels (2)
Data Source
Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.