Saltend

BSPNPG132 kV 33 kV

Location

Loading map...
Coordinates

53.748466, -0.148492

Matched from heatmap
Get Directions

Site Summary

Voltage Levels

3

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
13
Projects
Unlock the full 13-project queue with a premium subscription

Capacity Forecast

Premium
Unlock multi-year capacity forecasts with premium

Voltage Levels (3)

132kV

1 busbar
SALTEND 132 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

33kV

2 busbars
ELLIFOOT LANE 33 kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

██.█MVA

SALTEND 33 kVNPGunknown
distribution
Gen Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Demand Headroom

██.█MW

native:cim-npg; native:npg-ltds-appendix-5

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Data Source

Primary DNO:Northern Powergrid
License:OGL v3

Data sourced from publicly available DNO datasets. Indicative — verify directly with the DNO before making connection decisions.