Prissick
Upstream:BSPLackenbyGSPLackenby· headroom can be limited upstream
At a glance
Generation Locked Sources retrieved 27 Sep 2026- Generation headroom
- ██.█MW
- Prissick 11 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 27 Sep 2026
- Projects
- 5
11 kV
1 busbarVoltage not stated
2 busbarsPRISSICK (YELLOW)
NPGdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, fault level.
Prissick
NPGdistribution Source (opens the operator's dataset in a new tab)No capacity or fault data published for this busbar
Other voltage levels
- 66 kVPrissick 66 kV NPGNo capacity or fault data published for this busbar
Planned reinforcement
2 schemes, +21 MVA, first in service 2026DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 1km of 66kV underground cables | Condition | +0.0 MVA | 2026 |
| Full substation upgrade including transformers, switchboards | Load | +21.2 MVA | 2033 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences