Potter House
Upstream:GSPSpennymoor GSP· headroom can be limited upstream
At a glance
Generation Locked Sources retrieved 27 Sep 2026- Generation headroom
- ██.█MW
- Potter House 66 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 5 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 27 Sep 2026
- Projects
- 8
66 kV
1 busbar20 kV
1 busbarPotter House 20 kV
NPG Generation Lockeddistribution11 kV
1 busbarPotter House 11 kV
NPG Generation LockeddistributionOther voltage levels
- 132 kVPotter House 132 kV NPGNo capacity or fault data published for this busbar
- Voltage not statedPotter House T1 T3 NPGNo capacity or fault data published for this busbar
Planned reinforcement
1 scheme, first in service 2029DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of Transformers T1 & T3 | Condition | +0.0 MVA | 2029 |
Data source
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences