Poppleton
At a glance
Generation Locked Sources retrieved 27 Sep 2026- Generation headroom
- ██.█MW
- Poppleton 33 kV. NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026
Highest figure across the site's 4 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Location
Connection queue
NPG Embedded Capacity Register (>=1 MW), retrieved 27 Sep 2026
- Projects
- 11
33 kV
1 busbarVoltage not stated
3 busbarsPoppleton
NGETtransmission Source (opens the operator's dataset in a new tab)Not openly published by NESO
Poppleton
NPGdistribution Source (opens the operator's dataset in a new tab)No capacity or fault data published for this busbar
POPPLETON INDUSTRIAL
NPGdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, fault level.
Planned reinforcement
1 scheme, first in service 2028DNO Network Development Reports
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 33kV switchboard | Connections | 2028 |
Data source
Distribution operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Transmission owner: National Grid Electricity Transmission. Licence: NESO Open Data Licence
Supported by Northern Powergrid Open Data Supported by National Energy SO Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO and TSO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the operators before making connection decisions. Attribution and licences