Pitsmoor
GSPNPGNGET275 kV 33 kV
Generation Connection Queue
Embedded Capacity Register + NESO TEC██ MW
Queued
██ MW
Connected
3
Projects
Planned Reinforcement
DNO Network Development Reports—
Total uplift
2027
First completion
2
Schemes
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| Replacement of 33kV switchgear | Condition | — | 2027 |
| Replacement of 22 x 33kV circuit breakers and removal of 6 x 33kV circuit breakers | Asset replacement due to deteriorating condition and performance and fault level reinforcement investment. | — | 2028 |
Voltage Levels (5)
275kV
1 busbar33kV
3 busbarsPitsmoor 3/4NPGunknown
distributionPitsmoor 33kVNPG
distributionData Source
Distribution Operator:Northern Powergrid
Transmission Owner:National Grid Electricity Transmission
Licence:NESO Open Data Licence
Office for National Statistics licensed under the Open Government Licence v.3.0. Contains OS data © Crown copyright and database right [2019-]
Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.