Pitsmoor

GSPNPGNGET275 kV 33 kV

Location

Loading map...
Coordinates

53.400460, -1.442150

From DNO data
Get Directions

Site Summary

Voltage Levels

4

Best Gen RAG
unknown
Best Gen Headroom

██.█MW

Best Demand Headroom

██.█MW

Operators

NGET, NPG

Generation Connection Queue

Embedded Capacity Register + NESO TEC
██ MW
Queued
██ MW
Connected
13
Projects
Unlock the full 13-project queue with a premium subscription

Planned Reinforcement

DNO Network Development Reports
Total uplift
2027
First completion
2
Schemes
SchemeDriverUpliftIn service
Replacement of 33kV switchgearCondition2027
Replacement of 22 x 33kV circuit breakers and removal of 6 x 33kV circuit breakersAsset replacement due to deteriorating condition and performance and fault level reinforcement investment.2027

Voltage Levels (4)

275kV

1 busbar
PitsmoorNGET
transmission
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

min: 17.8 kA

Firm Capacity

N/A

33kV

3 busbars
Pitsmoor 3/4NPGunknown
distribution
Gen Headroom

██.█MW

NPG Heatmap Data

Demand Headroom

██.█MW

NPG Heatmap Data

Fault Level (3ph)

██.█kA

Firm Capacity

██.█MVA

Pitsmoor 33kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

N/A

Firm Capacity

N/A

Pitsmoor 1 2 33kVNPG
distribution
Gen Headroom

N/A

Demand Headroom

N/A

Fault Level (3ph)

██.█kA

Firm Capacity

N/A

Data Source

Distribution Operator:Northern Powergrid
License:OGL v3
Transmission Owner:National Grid Electricity Transmission
License:NESO Open Data Licence (OGL v3.0 based)

Data sourced from publicly available DNO and TSO datasets. Indicative — verify directly with the operators before making connection decisions.