Padgate

PrimarySPEN33 kV11 kV

At a glance

Generation headroom, free

Green

Under 5MW

Source SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
██.█MW
PADGATE 11kV. SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026
Fault level
██.█kA
Padgate 33kV. SPM LTDS Appendix 4 Fault Levels (Table 4) 33kV 3ph
Firm capacity
██.█MVA
PADGATE 11kV. SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Fault level near your switchgear rating? Star Delta Power does the study.

Location

53.40520, -2.55680

Matched from heatmap
Directions (Google Maps, new tab)

33 kV

1 busbar

Padgate 33kV

SPENdistribution Source (opens the operator's dataset in a new tab)
Fault level (3-phase)
██.█kA
SPM LTDS Appendix 4 Fault Levels (Table 4) 33kV 3ph

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Make rating
██.█kA
Break rating
██.█kA

11 kV

1 busbar

PADGATE 11kV

SPEN Generation Lockeddistribution
Generation headroom
██.█MW
SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026
Demand headroom
██.█MW
SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026
Firm capacity
██.█MVA
SPM distribution capacity heat map (names are transformer-level, some are groups), retrieved 27 Sep 2026

Not published for this busbar: fault level.

Data source

Network operator: SP Energy Networks. Licence: CC BY 4.0