Norrington

BSPSSEN132 kV33 kV

Upstream:GSPMelksham GSP· headroom can be limited upstream

At a glance

Generation Locked Sources retrieved 27 Sep 2026
Generation headroom
██.█MW
NORRINGTON 33 kV. SSEN Headroom Dashboard Data, March 2026, retrieved 27 Sep 2026
Demand headroom
██.█MW
NORRINGTON 33 kV. SSEN Headroom Dashboard Data, March 2026, retrieved 27 Sep 2026
Fault level
██.█kA
NORRINGTON 132 kV. SEPD LTDS Tables 1-7, May 2026 (Table 4a/4b, node names from Tables 1-2)
Firm capacity
██.█MVA
NORRINGTON 33 kV. SSEN LTDS Table 3 firm capacity (SEPD + SHEPD, newest edition), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

51.38377, -2.16990

From DNO data
Directions (Google Maps, new tab)

Connection queue

SSEN ECR Part 1, 1 MW and 50 kW registers (files), retrieved 27 Sep 2026

Queued
██.█MW
Connected
██.█MW
Projects
25
Unlock the full 25-project queue with a premium subscription

132 kV

1 busbar

NORRINGTON 132 kV

SSENdistribution
Fault level (3-phase)
██.█kA
SEPD LTDS Tables 1-7, May 2026 (Table 4a/4b, node names from Tables 1-2)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA

33 kV

1 busbar

NORRINGTON 33 kV

SSEN Generation Lockeddistribution
Generation headroom
██.█MW
SSEN Headroom Dashboard Data, March 2026, retrieved 27 Sep 2026
Demand headroom
██.█MW
SSEN Headroom Dashboard Data, March 2026, retrieved 27 Sep 2026
Firm capacity
██.█MVA
SSEN LTDS Table 3 firm capacity (SEPD + SHEPD, newest edition), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
SSEN Headroom Dashboard Data, March 2026
Fault and rating detail
Break rating
██.█kA

Data source

Network operator: Scottish and Southern Electricity Networks. Licence: CC BY 4.0

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences