Newport Pagnell

PrimaryNGED33 kV11 kV

Upstream:GSPEast Claydon· headroom can be limited upstream

At a glance

Generation headroom, free

Amber

Network operator's rating, limited by thermal capacity, not headroom

Under 5MW

Source NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026Highest of 2 busbarsBand free, exact MW with Pro

Other figures

Sources retrieved 27 Sep 2026
Demand headroom
██.█MW
Newport Pagnell 11 kV. NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Fault level
██.█kA
Newport Pagnell 33 kV. NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Firm capacity
██.█MVA
Newport Pagnell 11 kV. NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

52.07594, -0.72588

From DNO data
Directions (Google Maps, new tab)

Connection queue

NGED connection queue, 45 per-GSP CSVs, one row per machine, retrieved 27 Sep 2026

Queued
29 MW
Connected
0.0 MW
Projects
2
See the 2 projects behind this queue with Pro

33 kV

1 busbar

Newport Pagnell 33 kV

NGEDdistribution
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA

11 kV

1 busbar

Newport Pagnell 11 kV

NGED Generation Lockeddistribution
Generation headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Demand headroom
██.█MW
NGED LTDS Capacity Heatmap, four licence areas (July 2026), retrieved 27 Sep 2026
Firm capacity
██.█MVA
NGED LTDS Table 3 Demand (+ Attachment 8 node names), retrieved 27 Sep 2026
Fault level (3-phase)
██.█kA
NGED LTDS Table 4 Fault Level (ltds-tabular-model)
Fault and rating detail
Fault level (1-phase)
██.█kA
Make rating
██.█kA
Break rating
██.█kA

Data source

Network operator: National Grid Electricity Distribution. Licence: WPD Open Data Licence

Supported by NGED Open Data

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences