Netherlands Way

BSPNPG132 kV33 kV

At a glance

Sources retrieved 27 Sep 2026
Generation headroom
██.█MW
NETHERLANDS WAY 33 kV. NPG NDP generation headroom (DFES 2026 scenarios), retrieved 6 Sep 2026
Demand headroom
██.█MW
NETHERLANDS WAY 33 kV. NPG NDP demand headroom (DFES 2026 scenarios), retrieved 27 Sep 2026
Fault level
Not published
Firm capacity
Not published

Highest figure across the site's 2 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

No published position for this site

Connection queue

NPG Embedded Capacity Register (>=1 MW), retrieved 27 Sep 2026

Queued
██.█MW
Connected
██.█MW
Projects
5
Unlock the full 5-project queue with a premium subscription

33 kV

1 busbar

NETHERLANDS WAY 33 kV

NPGdistribution
Generation headroom
██.█MW
NPG NDP generation headroom (DFES 2026 scenarios), retrieved 6 Sep 2026
Demand headroom
██.█MW
NPG NDP demand headroom (DFES 2026 scenarios), retrieved 27 Sep 2026

Not published for this busbar: firm capacity, fault level.

Other voltage levels

  • 132 kVNETHERLANDS WAY 132 kV NPGNo capacity or fault data published for this busbar

Planned reinforcement

1 scheme, +120 MVA, first in service 2026DNO Network Development Reports
SchemeDriverUpliftIn service
Construction of new 132/33kV supply pointConnections+120.0 MVA2026

Data source

Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0

Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences