Melksham

GSPSSEN132 kV33 kV11 kV

At a glance

Generation Locked Sources retrieved 27 Sep 2026
Generation headroom
Not published
Demand headroom
Not published
Fault level
██.█kA
MELKSHAM 132 kV. SSEN Headroom Dashboard Data, March 2026
Firm capacity
Not published

Highest figure across the site's 3 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.

Location

51.39186, -2.15043

From DNO data
Directions (Google Maps, new tab)

Connection queue

SSEN ECR Part 1, 1 MW and 50 kW registers (files), retrieved 27 Sep 2026

Queued
██.█MW
Connected
██.█MW
Projects
15
Unlock the full 15-project queue with a premium subscription

132 kV

1 busbar

MELKSHAM 132 kV

SSEN Generation Lockeddistribution
Fault level (3-phase)
██.█kA
SSEN Headroom Dashboard Data, March 2026

Not published for this busbar: generation headroom, demand headroom, firm capacity.

GSP export limitGSP group
██.█MW
Winter. SSEN GSP Technical Limits (CSV), retrieved 27 Sep 2026
GSP import limitGSP group
██.█MW
Solar Max. SSEN GSP Technical Limits (CSV), retrieved 27 Sep 2026
Fault and rating detail
Fault level (1-phase)
██.█kA
Break rating
██.█kA

33 kV

1 busbar

MELKSHAM 33 kV

SSENdistribution
Fault level (3-phase)
██.█kA
SSEN LTDS CIM Fault Level Existing (EQ-SC-SCR), May 2026

Not published for this busbar: generation headroom, demand headroom, firm capacity.

Other voltage levels

  • 11 kVMELKSHAM 11 kV SSENNo capacity or fault data published for this busbar

Planned reinforcement

2 schemes, first in service 2036DNO Network Development Reports
SchemeDriverUpliftIn service
Demand reinforcement at Melksham (NSHR expected in-service date 2036)Capacity2036
Generation reinforcement at Melksham (NSHR expected in-service date 2036)Capacity2036

Data source

Network operator: Scottish and Southern Electricity Networks. Licence: CC BY 4.0

Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences