Maddison St 66kV
NPGdistribution Source (opens the operator's dataset in a new tab)Not published for this busbar: generation headroom, demand headroom, firm capacity.
Upstream:GSPBlyth· headroom can be limited upstream
Generation headroom, free
Green
No headroom
Source NPG Heat Map Data - Table (firm, demand, headroom), retrieved 27 Sep 2026Highest of 6 busbarsBand free, exact MW with Pro
Other figures
Sources retrieved 15 Oct 2026Highest figure across the site's 6 busbars; fault level is the busbar nearest its break rating. Each busbar is listed below.
Fault level near your switchgear rating? Star Delta Power does the study.
NPG Embedded Capacity Register (>=1 MW); NPG Embedded Capacity Register Part 2, retrieved 15 Oct 2026
Not published for this busbar: generation headroom, demand headroom, firm capacity.
No capacity or fault data published for this busbar
Not published for this busbar: generation headroom, demand headroom, firm capacity.
Not published for this busbar: generation headroom, fault level.
No capacity or fault data published for this busbar
| Scheme | Driver | Uplift | In service |
|---|---|---|---|
| These works will impact upon the available capacity at this substation. | Asset replacement due to deteriorating condition and performance | 2027 | |
| Replacement of 66/11kV Transformer T2 and 66kV circuit breaker | Condition | +0.0 MVA | 2027 |
Network operator: Northern Powergrid. Licence: Northern Powergrid Open Data Licence v1.0
Supported by Northern Powergrid Open Data Office for National Statistics licensed under the Open Government Licence v.3.0 Contains OS data © Crown copyright and database right [2019-]
Derived from publicly available DNO datasets: we cluster, merge and calculate from the published records, so these figures are modified from the source. Indicative only; verify directly with the DNO before making connection decisions. Attribution and licences